Choosing Nancome for faster ROI with one-stop delivery, customization, backend support, and service
Introduction
As transportation electrifies worldwide, enterprise-owned charging has shifted from “nice to have” to critical infrastructure. Corporate campuses, office parks, logistics hubs, retail chains, hotels, and fleet operators can all unlock measurable value by deploying smart, right-sized EV charging. With Nancome’s “solutions + service + one-stop + customization + backend support + investment return” approach, companies move from feasibility to revenue quickly—reducing energy cost, attracting customers and talent, and strengthening ESG credentials.
1) Who benefits most from enterprise charging
Corporate & fleet operators: On-prem ev charger for workplace lowers total cost of ownership via off-peak charging and faster turnarounds; ev charger with Plug & Charge trims dwell time and driver friction.
Retail, hospitality & destinations: Parking-while-charging increases dwell and basket size. A well-planned ev dc fast charging station for parking lot turns traffic into incremental revenue.
Property owners & park operators: Combine charger station ev floor-standing for flagship bays with ev charger wall-mounted for broad coverage to raise NOI and asset value.
Emerging markets: Start lean with dc fast charging station 60kW GB/T/CCS2/CCS1/CHAdeMO, scale high-throughput corridors with dc fast charging station 120kW GB/T/CCS2/CCS1/CHAdeMO as utilization rises.
2) The business case: from cost savings to brand equity
Operational savings: Smart scheduling + time-of-use tariffs cut per-km energy spend; Plug & Charge shortens queueing and improves bay turnover.
New revenue streams: Public or semi-public pricing (per kWh / per minute / session fees) plus cross-sell (“charge & shop/stay/eat”).
ESG & brand lift: Tangible carbon reduction, auditable data for sustainability reporting and tender scoring.
Data advantage: Utilization, dwell, and time-of-day insights inform staffing, pricing, and future expansion.
3) Picking the right hardware for each site
Form factors
charger station ev floor-standing: Large display, robust cable management—ideal for public-facing bays and brand presence.
ev charger wall-mounted: Low-footprint, budget-friendly installs along walls and pillars for comprehensive coverage.
Power tiers
dc fast charging station 60kW GB/T/CCS2/CCS1/CHAdeMO: Destination and campus “top-up” with modest grid impact; attractive CAPEX and straightforward permitting.
dc fast charging station 120kW GB/T/CCS2/CCS1/CHAdeMO: High-turnover sites and mixed vehicle classes; cuts wait times and lifts revenue per bay.
ev dc fast charging station for parking lot: Apply by zone (outdoor/indoor), ventilation, IP rating, e-stop access, and traffic flow.
Experience & safety
ev charger with Plug & Charge for instant authentication; optional app/RFID for memberships, coupons, and corporate billing.
Full protections (OV/OC/OT), e-stop, fire and ventilation compliance for commercial facilities.
4) One-stop delivery with Nancome: de-risk and accelerate
Commercial modeling: Load and tariff study, capacity forecast, and 3–5-year ROI (IRR/NPV) across workplace vs. public monetization.
Design & permitting: Load checks, transformer and cabling, civil and fire reviews, and utility interconnection—handled end-to-end.
Equipment & build: Modular DC power, dual-gun power sharing, climate-ready enclosures; standardized install to minimize downtime.
Platform & backend: OCPP-based backend with dynamic pricing, power capping, memberships, coupons, and one-click reports.
Operations uplift: Pricing playbooks, merchant co-promotions, “charge & shop” bundles; remote updates and 24/7 tech support.
Outcome focus: a single partner for solution + service + customization + backend, turning complex engineering into a fast, bankable rollout.
5) Global market lens: deploy on the growth curve
Mature markets : Experience and uptime win. Pair flagship charger station ev floor-standing with broad ev charger wall-mounted coverage; lean on Plug & Charge for repeat users.
High-growth markets: Enter with dc fast charging station 60kW GB/T/CCS2/CCS1/CHAdeMO, upgrade hot zones to dc fast charging station 120kW GB/T/CCS2/CCS1/CHAdeMO as traffic builds; co-locate with malls, fuel stations, and food courts.
Power-constrained regions (parts of Africa): Blend PV + storage with staged grid upgrades to stabilize cash flow and ease interconnection bottlenecks.
6) ROI snapshot (how sites pay back)
Revenue: kWh/min/session fees + parking/service fees + partner subsidies;
Costs: energy + demand/capacity + depreciation + maintenance (modular spares cut downtime);
Optimization: Use ev dc fast charging station for parking lot for peak-hour fast turns; fill valleys with ev charger wall-mounted overnight charging; maximize conversion via ev charger with Plug & Charge.
Typical destination sites using a 60 kW baseline with 120 kW peak bays can target positive cash flow inside 18–36 months, subject to local tariffs, traffic, and vehicle mix.
Conclusion
Building an enterprise charging network isn’t just adding hardware—it’s launching a repeatable energy business. With Nancome’s one-stop delivery and tailored design, you can mix charger station ev floor-standing and ev charger wall-mounted, enable ev charger with Plug & Charge, and right-size capacity with dc fast charging station 60kW
GB/T/CCS2/CCS1/CHAdeMO and dc fast charging station 120kW
GB/T/CCS2/CCS1/CHAdeMO across a cohesive ev dc fast charging station for parking lot strategy. The result: measurable ROI, stronger ESG, happier drivers, and a durable competitive edge—delivered by a partner engineered for solutions, service, and long-term support.




Leave a comment
All comments are moderated before being published.
This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.